The project
The upstairs bathroom and kitchen kept their existing 50-litre water heater. CPM installed a separate 50-litre electric unit for the accessible bathroom on the ground floor.
Plumbing work
- Connected new in-ground sanitary drainage to the existing sewer.
- Installed waste branches and vents for the fixtures.
- Ran hot and warm water pipework and fitted mixing valves for temperature control.